My favorite contractor has the studio coming along nicely. Some “before” pictures are included in my November 7, 2018 blog post titled Temporary Studio.
Completed:
Electrical service upgraded – kiln is live
New concrete floor in the Clay Room- virtually eliminates the horse aromas which were endearing but became less so over time
Enclosed eaves – keeps out the birds
Wall between Glaze/Kiln Room and Clay Room removed, and new support installed – better sight lines
Electrical outlet and lighting installed – improves safety and convenience
Two windows installed in Clay Room Dutch doors – natural light is wonderful
Double basin utility sink with HOT water installed in Glaze/Kiln Room– using buckets underneath temporarily
To do:
Sewer connection for utility sink
Assemble heavy duty storage shelves on wheels and get organized
Seal doors to reduce rain water migration that occurs primarily in January